Our Own Packaging Factory in Dongguan
5,000 m² · 70+ staff · Heidelberg Speedmaster CD102 5-colour press · 2,000,000 pcs/day peak capacity · MOQ from 500 pcs
Dongguan Zhengyang Packaging & Printing Co., Ltd. is the owner and operator of this factory in Chang'an, Dongguan, China — not a trading company. Everything below belongs to our single production site: the address, the Heidelberg press, the in-house inspection lab and the factory tours we host for buyers.
What Our Dongguan Factory Does In-House
Prepress, Structural Design & Sampling
Artwork, structure and dielines are checked and proofed by our own prepress team inside the plant, with physical samples ready in 3–8 days.
Offset Printing on a Heidelberg CD102
Our key press is a Heidelberg Speedmaster CD102 5-colour offset press, running rigid gift boxes, folding cartons, mailer boxes, paper bags and hang tags.
Post-Press Finishing & Converting
Die-cutting, foil stamping, embossing, lamination, gluing and hand assembly all happen in the same building, so a finishing change never leaves the factory.
Quality Control & Inspection Lab
Colour inspection, dimension inspection, surface inspection and adhesion/durability testing are carried out by our own QC staff, not by an outside lab.
Own Factory, Not a Trading Company — Why It Matters
One accountable legal entity
The company that quotes you, Dongguan Zhengyang Packaging & Printing Co., Ltd., is the company that owns the plant. The same name sits on the business licence, the bank account and every certificate.
Your brief reaches the press directly
Structure and finishing changes go straight to the people who set up the Heidelberg CD102 — no intermediary to relay the question, and no relayed answer to wait for.
In-house quality control
Colour, dimension, surface and adhesion/durability checks run inside the building, with colour held to a tolerance of ΔE ≤ 2 and batch records kept for traceability.
Factory tours, on site or by video
Visit No. 4 Guang'an Road in Chang'an Town, Dongguan, or ask for a live walkthrough of the prepress, printing, finishing and inspection areas before you order.
10,000+ Brands Sourced From This One Factory
Every Zhengyang order is produced at our single factory in Dongguan, China and shipped to 30+ export countries, including the USA, Canada, the UK, Germany, France, Australia and Japan. We hold Disney FAMA authorization and supply global retailers such as Claire's, on FOB, CIF and DDP door-to-door terms.
One factory in Dongguan — what is inside it
Zhengyang Packaging operates exactly one production site: No. 4 Guang'an Road, Zhen'an Technology Industrial Park, Chang'an Town, Dongguan, Guangdong, China. The plant covers 5,000 m² and employs 70+ people across prepress, printing, finishing and inspection. We were founded in July 2006, so the team brings more than 20 years of packaging and printing experience to every order.
The key press is a Heidelberg Speedmaster CD102 5-colour offset press, supported by in-house prepress, die-cutting, gluing and hand-assembly lines. Peak capacity reaches 2,000,000 pcs per day, MOQ starts at 500 pcs per design, and standard production lead time is 7–15 working days with samples in 3–8 days. There is no second factory, no Shenzhen site and no overseas plant.
Quality control and the difference an own factory makes
Colour inspection, dimension inspection, surface inspection and adhesion/durability testing all run inside the same building. Colour is held to a tolerance of ΔE ≤ 2, and our production holds a 100% on-time delivery rate against the confirmed schedule.
Because we own the factory instead of trading through one, the company that quotes your order is the company that prints, inspects and ships it. Nothing is subcontracted to an unknown third party, so a defect or a delay has one accountable owner — us — from artwork to loading.
How an Order Moves Through the Factory
Prepress & design
Artwork, structure and dielines are checked and proofed in our prepress department before a printing plate is made
Printing
The Heidelberg CD102 5-colour press runs the job, with colour matched to the approved proof at ΔE ≤ 2
Post-press finishing
Die-cutting, foil stamping, embossing, lamination, gluing and hand assembly are completed in-house
Quality control
Colour, dimension, surface and adhesion/durability inspections gate every batch before packing and export
Dongguan Factory — Key Facts
| Item | Detail |
|---|---|
| Founded | July 2006 — 20+ years of packaging and printing experience |
| Location | No. 4 Guang'an Road, Zhen'an Technology Industrial Park, Chang'an Town, Dongguan, Guangdong, China |
| Factory area | 5,000 m², one single production site |
| Workforce | 70+ employees |
| Key press | Heidelberg Speedmaster CD102 5-colour offset press |
| Peak capacity | 2,000,000 pcs per day |
| MOQ | From 500 pcs per design |
| Colour tolerance | ΔE ≤ 2 |
| Lead time | 7–15 working days; samples in 3–8 days |
| Certifications | ISO 9001:2015 (SGS), FSC C018715 / ESTS-COC-251148, Sedex SMETA 4-Pillar, CE No. NB202410705, RoHS, TÜV Rheinland 4.9/5 (2025), Disney FAMA |
| Export markets | 30+ countries; 10,000+ brands served |
Certifications Held by the Factory
The Dongguan factory is certified and audited under the same legal entity that quotes you. Scans of our ISO 9001:2015, FSC CoC, CE, RoHS and Disney FAMA certificates are available on request — tell us the certificate number you need to verify.
Dongguan Packaging Factory FAQs
Do you own the factory, or are you a trading company?
We own the factory. Dongguan Zhengyang Packaging & Printing Co., Ltd. is the legal entity that operates the plant at No. 4 Guang'an Road, Zhen'an Technology Industrial Park, Chang'an Town, Dongguan — the same company that quotes, prints, inspects and exports your order. We are not a trading company and we do not subcontract production to other plants.
Where exactly is the factory, and can we visit it?
The factory is at No. 4 Guang'an Road, Zhen'an Technology Industrial Park, Chang'an Town, Dongguan, Guangdong, China. Buyers are welcome to arrange a factory tour: visit the site in person, or request a live video walkthrough of the prepress, printing, finishing and inspection areas.
What machines and capacity do you have?
Our key press is a Heidelberg Speedmaster CD102 5-colour offset press, supported by in-house prepress, die-cutting, gluing and hand-assembly lines. Peak capacity is 2,000,000 pcs per day, run by 70+ employees on a single 5,000 m² site.
What is the MOQ and lead time?
MOQ starts from 500 pcs per design. Standard production lead time is 7–15 working days after artwork approval, with samples in 3–8 days. We reply to quote requests within 2 hours and hold a 100% on-time delivery rate.
Which certifications does the factory hold?
ISO 9001:2015 certified by SGS, FSC Chain of Custody FSC C018715 / ESTS-COC-251148, Sedex SMETA 4-Pillar, CE certificate No. NB202410705, RoHS EU test reports, a TÜV Rheinland factory audit score of 4.9/5 (2025) and Disney FAMA authorization.
Book a Factory Tour or Get a Factory-Direct Quote
Send your packaging specification, target quantity and any compliance requirements. Our export team replies within 2 hours with a factory-direct price and lead time.